photos2

Pincher Creek, Alberta

Posted on Posted in Wind

32MW Wind Energy Project

Partners: Clem Geo-Energy Corp
Capital Cost: $60M
Technology: 16x2MW wind turbines
Proposed Commercial Operation: 2022

The Pincher Creek area consists of cultivated land in an excellent, proven wind regime, close to roadways, distribution and transmission infrastructure. The project is bordered by Highway 507 to the south and Highway 11 to the east.

The Pincher Creek area consists of cultivated land in an excellent, proven wind regime, close to roadways, distribution and transmission infrastructure. The project is bordered by Highway 507 to the south and Highway 11 to the east.